Client Requirements
Open plan house wanted a staircase from ground floor to roof.
Arc Fabrications Solution
We fabricated in the workshop a 200×8 flat stringer with open grid flooring & basic style handrail. It was taken to site and erected to make sure it was fit for purpose before galvanising. We did this all the way up.
Testimonial / Reference Letter
Client was very happy with the work & thrilled to have a way upstairs to get to his bedroom!
“Good people who care”
Fabrication Materials Used
- Steel staircase.
Image Showcase
[nggallery id=12]